TO:
Honorable Mayor and Members of the City Council
THROUGH:
Talyn Mirzakhanian, City Manager
FROM:
Erick Lee, Public Works Director
Katherine Doherty, City Engineer
Jeff Fijalka, Principal Civil Engineer
Erik Zandvliet, City Traffic Engineer
SUBJECT:Title
Consideration of a Resolution Approving the Final Construction Drawings and Specifications for the 28th Street Stormwater Infiltration Project and Authorizing Solicitation of Competitive Bids for Construction of the Project; and Consideration of a Resolution Authorizing a Use and Maintenance Agreement with the County of Los Angeles Regarding a Connection to the County-Owned Storm Drain at 28th Street (No Budget Impact) (Public Works Director Lee).
(Estimated Time: 1 Hr.)
ADOPT RESOLUTION NOS. 25-0029 AND 25-0030
Body
_________________________________________________________
RECOMMENDATION:
Staff recommends that the City Council:
A. Adopt Resolution No. 25-0029, approving the final construction drawings and specifications for the 28th Street Stormwater Infiltration Project and authorizing the solicitation of competitive bids for the construction of the Project; and
B. Adopt Resolution No. 25-0030, authorizing a Use and Maintenance Agreement with the County of Los Angeles regarding a connection to the county-owned storm drain at 28th Street.
FISCAL IMPLICATIONS:
There are no direct fiscal implications associated with this item. The City has secured grant funding sufficient to cover all project design and construction costs. The City has been awarded over $30M in grant funding from three separate agencies to design and construct the stormwater infiltration system. Refer to the attached Budget and Expenditures Summary Report for additional details.
BACKGROUND:
Stormwater discharges from within the City of Manhattan Beach are governed by a Municipal Separate Storm Sewer System (MS4) Permit issued by the Los Angeles Regional Water Quality Control Board (Water Board). The MS4 permit was created to enforce...