Title: Formally Accept as Complete the Parking Structure Lot No. 2 Concrete Topping Slab Project Constructed by Slater Waterproofing, Inc.; Authorize Filing a Notice of Completion with the County Recorder; and Release the Retention in the Amount of $16,280 (Public Works Director Katsouleas). APPROVE
TO:
Honorable Mayor and Members of the City Council

THROUGH:
Mark Danaj, City Manager

FROM:
Stephanie Katsouleas, Public Works Director
Prem Kumar, City Engineer
Karen Domerchie, Senior Management Analyst

SUBJECT:Title
Formally Accept as Complete the Parking Structure Lot No. 2 Concrete Topping Slab Project Constructed by Slater Waterproofing, Inc.; Authorize Filing a Notice of Completion with the County Recorder; and Release the Retention in the Amount of $16,280 (Public Works Director Katsouleas).
APPROVE
Line
_________________________________________________________
Recommended Action
RECOMMENDATION:
Staff recommends that the City Council:

1. Formally accept as complete the Parking Structure Lot No.2 Concrete Topping Slab Project constructed by Slater Waterproofing, Inc;
2. Authorize filing of the appropriate Notice of Completion with the County Recorder's Office; and
3. Approve the release of the retention for $16,280 to Slater Waterproofing, Inc.
Body
FISCAL IMPLICATIONS:
The construction work was completed for the contract award amount of $162,803. It was not necessary to utilize the construction contingency amount approved for the project.

BACKGROUND:
Parking Structure Lot No. 2 is located at 222 12th Street in Manhattan Beach. This parking facility was built in 1979 and is a reinforced concrete structure with cast-in-place concrete columns. In September 2013, an assessment of the existing conditions of this parking structure was performed by Walker Restoration Consultants (Walker). The assessment identified the following structural needs:


1) Repairs to damaged post tensioned tendons in the deck concrete slab;
2) Installation of a vehicular barrier system;
3) Installation of a height restraint bar at the upper level entry to prevent large heavy load vehicles from driving on the parking structure deck; and
4) Re-striping of the parking stalls to meet current ADA Code requirements.

On March 1, 2016, City Council awarded a construction ...