TO:
Honorable Mayor and Members of the City Council
THROUGH:
Talyn Mirzakhanian, City Manager
FROM:
Erick Lee, Public Works Director
Gil Gamboa, Acting City Engineer
SUBJECT:Title
Lot 3 Parking Structure Local Emergency Update (Unbudgeted) (Public Works Director Lee).
DETERMINE THAT THERE IS A NEED TO CONTINUE THE EMERGENCY ACTION
Body
_________________________________________________________
RECOMMENDATION:
Staff recommends that the City Council determine, by four-fifths vote, that there is a need to continue the emergency action.
FISCAL IMPLICATIONS:
The original cost estimate for the demolition and replacement of the Lot 3 Parking Structure (Lot 3) with an at-grade parking lot was on the order of $3,000,000. Pursuant to Manhattan Beach Municipal Code Section 3.08.060.A.6.c, the emergency demolition and replacement phase is being carried out through multiple emergency contracts. To date, the City has expensed, encumbered, or planned for the amounts indicated in the following table.
General
Fund
Prop A
Fund
Meas M
Fund
Parking
Fund
TOTAL
DEMOLITION
Actual
-
-
-
258,071
258,071
Planned
-
-
-
291,929
291,929
Subtotal
-
-
-
550,000
550,000
INTERIM LOT
Actual
-
-
-
11,195
11,195
Planned
-
-
-
1,554,838
1,554,838
Subtotal
-
-
-
1,566,033
1,566,033
General
Fund
Prop A
Fund
Meas M
Fund
Parking
Fund
TOTAL
SHUTTLE
Actual
-
85,142
6,000
376
91,518
Subtotal
-
85,142
6,000
376
91,518
LOT CLOSURE
Actual
2,806
-
-
4,367
7,173
Subtotal
2,806
-
-
4,367
7,173
GRAND TOTAL
2,806
85,142
6,000
2,120,776
2,214,724
BACKGROUND:
The Lot 3 Parking Structure was a City-owned facility at the southwest corner of Morningside Drive and 12th Street in Downtown Manhattan Beach. The three-story structure was constructed in 1971 and contained 144 parking spaces critical to visitors and businesses in the Downtown area. In June 2024, City staff elected to close the structure indefinitely, following a series o...