Manhattan Beach Logo
File #: 25-0121    Version: 1
Type: Consent - Staff Report Status: Agenda Ready
In control: City Council Regular Meeting
On agenda: 3/4/2025 Final action:
Title: Lot 3 Parking Structure Local Emergency Update (Unbudgeted) (Public Works Director Lee). DETERMINE THAT THERE IS A NEED TO CONTINUE THE EMERGENCY ACTION
Attachments: 1. Resolution No. 24-0105, 2. Lot 3 Location Map
TO:
Honorable Mayor and Members of the City Council

THROUGH:
Talyn Mirzakhanian, City Manager

FROM:
Erick Lee, Public Works Director
Katherine Doherty, City Engineer
Jeff Fijalka, Principal Civil Engineer

SUBJECT:Title
Lot 3 Parking Structure Local Emergency Update (Unbudgeted) (Public Works Director Lee).
DETERMINE THAT THERE IS A NEED TO CONTINUE THE EMERGENCY ACTION
Body
_________________________________________________________
RECOMMENDATION:
Staff recommends that the City Council determine, by four-fifths vote, that there is a need to continue the emergency action.

FISCAL IMPLICATIONS:
The original cost estimate for the demolition and replacement of the Lot 3 Parking Structure (Lot 3) with an at-grade parking lot was on the order of $3,000,000. Pursuant to Manhattan Beach Municipal Code Section 3.08.060.A.6.c, the emergency demolition and replacement phase is being carried out through multiple emergency contracts. To date, the City has expensed, encumbered, or planned for the amounts indicated in the following table. Costs to construct the interim parking facility are not yet included.


General
Fund
Prop A
Fund
Meas M
Fund
Parking
Fund
TOTAL
DEMOLITION





Actual
-
-
-
258,071
258,071
Planned
-
-
-
291,929
291,929
Subtotal
-
-
-
550,000
550,000






INTERIM LOT





Actual
-
-
-
6,604
6,604
Planned
-
-
-
464,429
464,429
Subtotal
-
-
-
471,033
471,033


General
Fund
Prop A
Fund
Meas M
Fund
Parking
Fund
TOTAL
SHUTTLE





Actual
-
85,142
6,000
376
91,518
Subtotal
-
85,142
6,000
376
91,518






LOT CLOSURE





Actual
2,806
-
-
3,362
6,168
Subtotal
2,806
-
-
3,362
6,168






GRAND TOTAL
2,806
85,142
6,000
1,024,771
1,118,719


BACKGROUND:
The Lot 3 Parking Structure was a City-owned facility at the southwest corner of Morningside Drive and 12th Street in Downtown Manhattan Beach. The three-story structure was constructed in 1971 and contained 146 parking spaces critical to visitors and businesses in the Downt...

Click here for full text