Title: Update and Discussion Related to Redevelopment Options for a City-Owned Property Located at 400 Manhattan Beach Boulevard (Former US Bank Building) (No Immediate Budget Impact) (Community Development Director Alkire). (Estimated Time: 1 Hr.) DISCUSS AND PROVIDE DIRECTION
Attachments: 1. 1. Location Map, 2. 2. April 1, 2025 - City Council Staff Report (Web-Link Provided), 3. 3. August 5, 2025 - City Council Staff Report (Web-Link Provided), 4. 4. January 20, 2026 - City Council Staff Report (Web-Link Provided), 5. 5. April 21, 2026 - City Council Staff Report (Web-Link Provided), 6. 6. September 15, 2026 - City Council Staff Report (Web-Link Provided), 7. 7. Additional Market Analysis (Kosmont Companies) - 400 Manhattan Beach Boulevard, 8. 8. Original Preliminary Conceptual Design (September 2026) - 400 Manhattan Beach Boulevard, 9. 9. Alternative Preliminary Conceptual Design - 400 Manhattan Beach Boulevard, 10. 10. Public Comments Received, 11. 11. PowerPoint Presentation
Date Ver.Action ByActionResultAction DetailsDetailsVideo
No records to display.

TO:

Honorable Mayor and Members of the City Council

 

THROUGH:

Talyn Mirzakhanian, City Manager

 

FROM:

Masa Alkire, A.I.C.P., Community Development Director

Libby Bretthauer, Finance Director

Adam Finestone, A.I.C.P., Planning Manager

Tari Kuvhenguhwa, Associate Planner

                     

SUBJECT:Title

Update and Discussion Related to Redevelopment Options for a City-Owned Property Located at 400 Manhattan Beach Boulevard (Former US Bank Building)

(No Immediate Budget Impact) (Community Development Director Alkire).

(Estimated Time: 1 Hr.)

DISCUSS AND PROVIDE DIRECTION

Body

_________________________________________________________

 

RECOMMENDATION:

Staff recommends that the City Council receive this status update, discuss, and provide additional direction regarding the redevelopment of the City-owned property located at 400 Manhattan Beach Boulevard.

EXECUTIVE SUMMARY:
In the spring of 2025, after the purchase of the property located at 400 Manhattan Beach Boulevard, the City established “Project Pulse” as a coordinated approach for the redevelopment of that property and the City-owned Parking Lot 3 property at 1155 Morningside Drive. At its September 15, 2026, meeting, City Council reviewed a preliminary conceptual design for the 400 Manhattan Beach Boulevard site and held a robust discussion of redevelopment topics for the Project Pulse sites (see attached September 15, 2026, staff report).  At that September 15, 2026, City Council meeting, staff was directed to prioritize next steps for 400 Manhattan Beach Boulevard due to the bond financing implications related to the property acquisition.

 

This report covers the following specific topics that Council directed staff to return with an update on before the end of the year:

 

•                     Review of long-term financing plan

This report includes an overview of the bond financing initiated in 2025 for the acquisition of 400 Manhattan Beach Boulevard. The short-term bond financing timeline was structured to accommodate the City’s planned public engagement program and decision-making process for the ultimate use of the property. The financing timeline approved in 2025 aligns with the proposed timelines for the Request for Qualifications and Request for Proposals processes for a public-private partnership and the Vons site discussion included in this report.

 

•                     Next steps for alternative interim use as paid public parking

A Use Permit and Coastal Development Permit application have been submitted to initiate this process. Staff anticipates conducting a public hearing before the Planning Commission in Winter (1st Quarter) 2027. A building permit will then be required in order to complete any necessary improvements and memorialize the conversion of the site into a public parking lot. A pay station for the parking zone that this site will be included in has already been installed on the adjacent sidewalk.

 

•                     Revisions to the preliminary conceptual design to increase size of the building and reduce size of the parking lot

The City’s design consultant, Gensler, produced an alternative version of the original conceptual design that presented to City Council in September 2026. This results in approximately 3,300 - 3,400 square feet of additional floor area but would result in eight fewer onsite parking spaces.

 

•                     Combination of uses for future development with focus on tenant space size(s) (first floor) and alternative uses (second floor)

The City’s design consultant also produced alternative designs that provide smaller ground-floor tenant spaces for both the larger building footprint described above and the smaller building footprint of the original concept. City staff recommends City Council revisit uses explored during the public engagement program during the community design workshops, which are summarized in this report and establish a portfolio of potential uses for the second floor, but wait to refine until a development partner is identified.

 

•                     Next steps on a public-private partnership

Since the last City Council update, City staff worked with their economic development consultant, Kosmont Companies, to prepare an additional market analysis, which is one of the next steps required to pursue a public-private partnership. Staff has proposed a timeline for a Request for Qualifications (RFQ) and Request for Proposals (RFP) process to identify and select a development partner, starting in Winter (1st Quarter) 2027 and concluding by December 2027.

 

•                     Continued discussions with owners of Vons property regarding partnership opportunities

Since the September 2026 City Council meeting, staff has continued to work with their consultant to determine if a mutually beneficial path forward on joint re-development of the sites is possible. Discussions with Vons property ownership have not progressed to the point that a potential pathway for joint development has been identified. The major consideration for continuing discussions with the Vons property owners is the bond refinancing timeline. If the City Council directs staff to continue discussions beyond the initial December 15, 2026, deadline, staff would return to City Council for final direction related to the Vons site before the end of April 2027.


FISCAL IMPLICATIONS:

Staff and the City’s Municipal Advisors at KNN Public Finance revisited debt financing costs based on current market rates for the outstanding tax-exempt Certificates of Participation issued for the acquisition of 400 Manhattan Beach Boulevard. Refinancing this debt is anticipated before the maturity date on July 1, 2028, and before the construction phase. If the site use is privatized for office, retail and/or mixed-use development, then refinancing with taxable bonds at a higher interest rate is required.

 

Currently, the interest rate difference between tax-exempt and taxable bonds is approximately 1.4%, adding about $135,000 in annual debt service costs (totaling about $4.0 million over 30 years), which would be paid in whole or in part from tenant lease revenues. The ultimate costs will be determined in 2028 at the time of the refinancing.

 

Finance staff is actively monitoring the timelines for both the refinancing of the 2025A COPs and the bond financing needed for construction of the Senior and Scout Community Center project. If the opportunity arises to combine both financings, this would save the City staff time and costs of issuance.

 

BACKGROUND:

At the September 15, 2026, City Council meeting, following a robust public engagement program and periodic City Council updates, the City Council received a comprehensive status update on the Project Pulse work effort. Details on the public engagement program, public input received as a result of the program, and periodic City Council direction received by staff, can be found attached staff reports from the January 20, 2026, April 21, 2026, and September 15, 2026, City Council meetings.

 

At the September 15, 2026, meeting, Council directed staff to separate the discussion of future uses of the two Project Pulse properties. For this reason, future discussions about the  land uses will be separated for each property. Given that Parking Lot 3 is currently developed as a surface parking lot that generates revenue and carries no debt, the City Council directed staff to prioritize the 400 Manhattan Beach Boulevard property. City staff will return to City Council at a future date to continue discussions related to the redevelopment of Parking Lot 3.


DISCUSSION:

The information below is provided in response to direction received by the City Council at its September 15, 2026, meeting.

 

Review of Long-Term Financing

The City issued $12,495,000 in Certificates of Participation Series 2025A (Term Rate Mode) (the “2025A COPs”) to finance the acquisition cost of 400 Manhattan Beach Boulevard. Upon acquisition, the City had not yet determined the optimal long-term use for the property but initially intended to use 400 Manhattan Beach Boulevard for public use, which allowed the City to issue the 2025A COPs on a tax-exempt basis.

With the recent City Council direction to explore partnering with a private developer, the City must be mindful of certain constraints and requirements:

•                     In order to maintain the tax exemption with respect to the 2025A COPs, the City must continue to meet the requirements of the Internal Revenue Code, which include maintaining the use of the 400 Manhattan Beach Boulevard site for allowable tax-exempt purposes until these bonds are redeemed.

 

•                     Privatizing the use of 400 Manhattan Beach Boulevard requires the City to refinance the tax-exempt 2025A COPs to taxable debt as required by the IRS Code.

 

•                     In the event the City irrevocably determines to proceed with private development of 400 Manhattan Beach Boulevard, the City will be required to cause the redemption of the tax-exempt 2025A COPs within six months of such determination.

 

•                     Therefore, as the City considers an irrevocable agreement with a private developer, the City must also begin the steps to contemporaneously approve the actions required to 1) cause the redemption of the 2025A COPs, and 2) issue taxable COPs to provide the necessary funds for the redemption.

 

The refunding of the outstanding principal amount of the 2025A COPs to be redeemed can be financed by issuing taxable COPs. To reduce the issuance amount of taxable COPs, the City could consider paying down some of the debt using reserve funds (if available). This tradeoff will be evaluated in the coming months, factoring in reserve levels and current market rates.

 

The 2025A COPs were structured to allow redemption as early as January 1, 2028. The 2025A COPs are subject to mandatory tender by the current bondholders on July 1, 2028.  If the City has not yet made a final determination on how to proceed with 400 Manhattan Beach Boulevard by July 1, 2028, it will have to either remarket the 2025A COPs (for another short-term mode or potentially on a long-term basis) or issue taxable COPs on a long-term basis.

 

As the City works through the process regarding the ultimate use of 400 Manhattan Beach Boulevard, it must keep these financing considerations in mind. An irrevocable decision should not be made until the City has received and considered various quotes/proposals, reviewed the advantages and disadvantages of proceeding with potentially private uses, and received public input regarding the proposed development.

 

Interim Use: Paid Public Parking Status Update

At the September 2026 meeting, City Council provided direction to pursue an alternative interim use as paid public parking (also known as a commercial parking facility) until the site is redeveloped. In November 2026, the Public Works Department submitted an application for the Use Permit and Coastal Development Permit to allow this change of use. The Planning Division is currently processing the applications and anticipates presenting the project to the Planning Commission in Winter (1st Quarter) 2027 for their consideration. After Planning Commission approval of the Use Permit and Coastal Development Permit, a building permit will be required in order to complete any necessary improvements, including re-striping, and to memorialize the conversion of the site into a public parking lot. The site has already been identified as a parking zone on the City parking zone map recently adopted by City Council. In addition, the parking pay stations that have already been installed in the vicinity of the property as part of the City’s ongoing transition from individual parking meters to centralized pay stations can be used to serve 400 Manhattan Beach Boulevard when it is transitioned to a paid public parking use.

 

This interim paid public parking use is proposed to have 25 parking spaces, with an estimated revenue of $234,000 - $265,000/year (paid parking and citation revenue).

 

Alternative Conceptual Design: Larger Footprint and Reduced Parking

City staff and Gensler, the City’s design consultant, presented a preliminary conceptual design for the property at the September 15, 2026, City Council meeting. That conceptual design included the following elements:

 

•                     First Floor: 6,540 SF of Retail or food and beverage uses (shown as three tenant spaces)

•                     Second Floor: 5,100 SF of Creative office use (with an outdoor patio)

•                     Parking: Surface parking lot (16 spaces)

•                     Open Space: Flexible pedestrian plaza within and along Morningside Drive

 

Gensler’s conceptual design reviewed on September 15, 2026, intentionally took into consideration community input related to potential noise concerns, the size and scale of the project, and potential spillover parking impacts. This was done by conceptualizing a future building with a significant setback from the nearest residential use, a stepped-back second story along Manhattan Beach Boulevard, and an on-site surface parking lot for tenant use. The September 15, 2026, conceptual design plans are included as an attachment to this report.

 

As proposed, the September 15, 2026, version of the building included retail or food and beverage tenant spaces on the first floor, oriented towards Manhattan Beach Boulevard and the northern portion of the Morningside Drive frontage. On the second level, a creative office with an outdoor patio for that tenant was proposed. While there was some community interest expressed through the Project Pulse work effort in a public rooftop deck and food and beverage uses on the second story, the proposed design concept prioritized concerns stated above related to noise and neighborhood compatibility. Thus, the office use was chosen since the use would not generate disruptive outdoor activity in the evening hours. This decision was informed by preferences and concerns communicated to City staff through the Fall 2025 resident focus group and other engagement activities that included nearby residents among the overall participants.

 

After the discussion at its September 15, 2026, meeting, the City Council directed staff to explore a modified version of the conceptual design for future consideration. In line with Council direction, an alternative design that increased the size of the building, reduced the size of the parking lot and number of parking spaces, and explored alternative tenant space size(s) for the first floor has been prepared for Council consideration. This alternative design includes five commercial tenant spaces, with the same mix of uses as the original concept, subject to further direction from the City Council and discussed in more detail below:

 

•                     First Floor: 8,240 SF of Retail or food and beverage uses (shown as four tenant spaces)

•                     Second Floor: 6,760 SF of Creative office use (with an outdoor patio)

•                     Parking: Surface parking lot (8 spaces)

•                     Open Space: Flexible pedestrian plaza within and along Morningside Drive

 

This alternative version proposes an increase of approximately 3,300 - 3,400 square feet (or 28-29%)

 

It is also important to note that the tenant spaces on the first floor could be configured differently to provide for more tenant spaces. The alternative conceptual design plan is included as an attachment to this report.

 

Alternative Second-Story Uses

At the September 2026 City Council meeting, staff was directed to explore potential uses for the second story other than the creative office use with outdoor patio for use by the tenant. This work effort focused on revisiting community preferences expressed during the Project Pulse public engagement process and was informed by market research conducted by the City’s economic development consultant.

 

Summary of Preferred Uses from Community-Generated Site Designs

As part of Project Pulse’s one-year public engagement program, City staff conducted outreach activities and community workshops to collect input on potential future uses and identify current community preferences. Staff worked with the City’s design consultant to create preliminary conceptual plans, which were presented for additional community input at an open house event in Summer 2026. The community feedback collected and the preliminary design concepts were presented for City Council consideration and further direction in September 2026. To inform Council’s consideration of uses other than office for the second story, below is a summary of the uses included in the community-generated concepts for a mixed-use property during the Spring 2026 design workshops:

 

•                     Food & Beverage - Small (34%)

•                     Retail - Small (31%)

•                     Outdoor Stage (29%)

•                     Food & Beverage - Large (29%)

•                     Art Gallery (23%)

•                     Co-working Office (23%)

•                     Office (17%)

•                     Retail - Medium (14%)   

 

The percentages above represent how frequently those uses were included in the mixed-use concepts proposed by community members during the two-day design workshops. Additional preferences were identified for open space uses (such as outdoor seating or dining and green space) but are not listed above because they could be included with the aforementioned pedestrian plaza concept along Morningside Drive. That topic will return for continued City Council discussion and consideration at a later date after additional research is conducted by staff per previous City Council direction.

 

Community-Oriented Uses

Lastly, throughout the Project Pulse engagement process, the community has also expressed the desire for more community-oriented space. Since the Project Pulse work effort began in spring 2025, plans for other community spaces not related to Project Pulse in the downtown area have progressed, reducing the need for such a space to be directly a part of a project at 400 Manhattan Beach Boulevard. Those community spaces are:

 

•                     Senior and Scout Community Center: This is a two-story community center that the City has partnered with a non-profit (Friends of Senior and Scout House) to replace the existing one-story Scout House, located between the Joslyn Center and Live Oak Park. The construction plans were approved on October 21, 2026, by the Building and Safety Division, and funding has been partially allocated for the project as part of the City’s Capital Improvement Program. Construction costs will need to be financed by issuing tax-exempt Certificates of Participation. This center will be available for use by the non-profit, the City’s Older Adults Program, and the general public. 

 

•                     Manhattan Beach Library Annex/Expansion: At its April 21, 2026, meeting, the City Council received a report from the Parks and Recreation Department on a library community needs assessment, which included feedback from interviews with library stakeholders, focus groups, and a community survey. In response to Council direction, staff has been exploring potential options with the County to address community preferences identified through that outreach. In Winter (1st Quarter) 2027, City staff will be returning to City Council with an update related to design options for an annex which would be adjacent to the existing library building. The building is anticipated to support public uses similar to those that Project Pulse participants identified as desirable during the City’s outreach and community meetings. 

Taking the two projects above into consideration, a significant increase in available community space is anticipated to be constructed in the vicinity in the coming years. When coupled with the City Council’s direction over the course of the Project Pulse work effort that a mixed-use project at 400 Manhattan Beach Boulevard include income-generating uses, staff does not recommend that additional community space be considered for the property.

 

Overall, staff recommends that the City Council consider establishing a portfolio of potential uses for the second story and to wait to further refine that use until the City identifies a development partner (described in more detail in the Public-Private Partnership section below). 

 

Public-Private Partnership & Additional Market Analysis

Pursuant to City Council direction at the September 15, 2026, City Council meeting, City staff and their economic development consultant identified the next steps necessary to pursue a public-private partnership for redevelopment of 400 Manhattan Beach Boulevard. Given City Council’s direction to consider an expanded building footprint, alternative revenue-generating uses for the second story, and to take next steps to enter into a public-private partnership to redevelop the site, the City’s consultant prepared an additional market analysis. The analysis concluded that, with City Council’s preferred redevelopment path of entering into a public-private partnership with a private developer, who would construct and manage the property through a ground lease, it is conservatively estimated between 30 to 50 years to yield a return on the long-term City investment of acquiring this property. The additional market analysis that Kosmont prepared for this site is attached to this staff report. 

 

The next step toward entering into a public-private-partnership for the redevelopment of the property would be for the City to prepare a Request for Qualifications (RFQ) to gauge developer interest in a project that would fit within parameters established by the City Council. The goal would be to have an RFQ issued and a list of qualified development partners established in the first half of 2027. Subsequent to this, the City would issue a Request for Proposals (RFP) to the qualifying firms by September 2027, with partner selection occurring by the end of December 2027. This timing aligns with the City’s bond refinancing obligations described earlier in this report.

 

City Outreach to Vons Property Ownership: Status Update on Time-Limited Continued Discussions

Over the past year, City staff has been investigating potential opportunities to partner with ownership of the Vons property, directly east of 400 Manhattan Beach Boulevard, on a larger redevelopment effort across both sites. While this outreach was conducted in response to direction received from the City Council in August 2025, it was also a frequent public comment throughout the Project Pulse work effort. In April 2026, as part of the Project Pulse status update, staff provided an update on the outreach efforts conducted to date, noting that City staff and their economic development consultant met with the owners of the Vons property several times and were told ownership would consider their options and provide a response later in the Spring. Since that time, City staff and the City’s economic development consultant have continued to engage with the property ownership groups.

 

As part of the September 2026, City Council status update, staff provided additional information on the outreach efforts. At that time, staff noted that there appears to be at least some level of interest in a joint redevelopment of the sites from the ownership groups. That said, staff also informed the City Council that significant delays would impact the City’s bond-related redevelopment timeline for the 400 Manhattan Beach Boulevard site.

 

City Council directed staff to continue their outreach efforts on this issue but established a 90-day deadline by which the property ownership must formally indicate interest in a mutually agreeable project. Staff was also directed to return to the City Council with an interim status update at this December 1, 2026, meeting, prior to that 90-day deadline on December 15, 2026, to discuss and receive further direction from City Council.

 

Since the September 2026 City Council meeting, staff has continued to work with their consultant to determine if a mutually beneficial path forward on joint redevelopment of the sites was possible. A key aspect of this discussion is mutual interest in the type of development that could occur on a combined development site. From the City’s perspective, a viable future redevelopment would need to incorporate public-serving goals and project elements. Those elements could include public parking, as well as a mix of commercial uses that reflects the community preferences identified through the Project Pulse outreach efforts and community workshops.

 

Discussions with Vons property ownership has not progressed to the point that a potential pathway for joint development has been established. Therefore, staff recommends that Council direct staff to continue the discussions for an additional fixed period of time. The major consideration for continuing discussions with the Vons property owners is tied to the bond refinancing timeline. If the City Council directs staff to continue discussions beyond the initial December 15, 2026, deadline, staff recommends establishing an updated deadline of the end of April 2027. This would allow Staff to remain on track to issue an RFQ in May 2027 to identify a development partner for a stand-alone project at 400 Manhattan Beach Boulevard. Depending on the direction received from the City Council at the December 1, 2026, meeting, staff would return to the City Council to provide another update and seek final direction regarding the Vons site by early Spring 2027.

 

CONCLUSION:

Staff is seeking City Council direction on the following items:

 

1.                     Based on the financing timeline approved in 2025, staff recommends the following timeline for an RFQ and RFP process:

•                     Winter 2027 - April 2027: Prepare RFQ

•                     May 2027 - September 2027: Release RFQ for interested private developers. Then, prepare and release RFP to qualified firms.

•                     October 2027 - December 2027: Select development partner and enter into a Development and Disposition Agreement

 

2.                     Revised conceptual building footprint and parking quantity

•                     Expanded building footprint, with reduced rear setback and reduced on-site parking

 

3.                     Revised quantity and proportions for ground floor tenant spaces

•                     Conceptualize up to four ground floor tenant spaces (rather than three)

 

4.                     Alternative uses for second floor

•                     Consider alternative uses other than creative office

•                     Staff recommends that the City Council establish a menu of potential second floor uses for the time being, waiting to further refine until a development partner is identified

 

5.                      Time-Limited discussion with Vons Property Ownership

•                     Should City staff continue discussions on potential partnership opportunities with the Vons site owners beyond the initial December 15, 2026 deadline? If direction is provided to do so, staff recommends establishing an updated deadline for staff to return to City Council by early Spring 2027 for a final decision.

o                     This would enable the City to stay on track with its bond refinancing obligations, and start the RFQ/RFP process indicated above if a viable path has not been identified with the Vons property ownership groups.

 

PUBLIC OUTREACH:
A significant amount of public outreach has been conducted for Project Pulse since Spring 2025. Information on that outreach has been provided in previous status update reports to City Council in 2025 and 2026, including the most recent update provided in September 2026, attached to this report).

 

Additionally, a variety of communication methods were used ahead of this City Council meeting. This includes a courtesy notice published in the Beach Reporter, email blasts to interested parties (including the Chamber of Commerce and the Downtown Business and Professionals Association), postings on the City’s social media platforms, and mailings to property owners and residents within a 300-foot radius of 400 Manhattan Beach Boulevard ahead of this City Council meeting. As of the writing of this staff report, staff has received one public comment, which is attached to this report.

ENVIRONMENTAL REVIEW:
Discussing the matter and receiving direction from City Council is not a “Project” as defined under Section 15378 of the California Environmental Quality Act (CEQA) Guidelines; therefore, the activity is not subject to CEQA pursuant to Section 15060(c)(3). While the goal of this discussion is to make progress towards developing a concept for the property, any future redevelopment project that the City Council identifies for this property will be subject to applicable provisions of CEQA and will be analyzed at that time.

LEGAL REVIEW:
The City Attorney has reviewed this report and determined that no additional legal analysis is necessary.

 

ATTACHMENTS:
1. Location Map
2. April 1, 2025 - City Council Staff Report (Web-Link Provided)
3. August 5, 2025 - City Council Staff Report (Web-Link Provided)

4. January 20 2026 - City Council Staff Report (Web-Link Provided)

5. April 21, 2026 - City Council Staff Report (Web-Link Provided)

6. September 15, 2026 - City Council Staff Report (Web-Link Provided)

7. Additional Market Analysis (Kosmont Companies)

8. Original Preliminary Design Concept (September 2026) - 400 Manhattan Beach Boulevard

9. Alternative Preliminary Design Concept - 400 Manhattan Beach Boulevard

10. Public Comments Received

11. PowerPoint Presentation