Legislation Details

File #: 24-0346    Version: 1
Type: *Consent - Staff Report Status: Agenda Ready
In control: City Council Regular Meeting
On agenda: 12/17/2024 Final action: 12/17/2024
Title: Lot 3 Parking Structure Local Emergency Update (Public Works Director Lee). DETERMINE THAT THERE IS A NEED TO CONTINUE THE EMERGENCY ACTION
Attachments: 1. Resolution No. 24-0105, 2. Location Map
TO:
Honorable Mayor and Members of the City Council

THROUGH:
Talyn Mirzakhanian, City Manager

FROM:
Erick Lee, Public Works Director
Katherine Doherty, City Engineer
Jeff Fijalka, Principal Civil Engineer

SUBJECT:Title
Lot 3 Parking Structure Local Emergency Update (Public Works Director Lee).
DETERMINE THAT THERE IS A NEED TO CONTINUE THE EMERGENCY ACTION
Body
_________________________________________________________

RECOMMENDATION:
Staff recommends that the City Council determine, by four-fifths vote, that there is a need to continue the emergency action.

FISCAL IMPLICATIONS:
The original cost estimate for the demolition and replacement of the Lot 3 Parking Structure (Lot 3) with an at-grade parking lot was on the order of $3,000,000. Pursuant to Manhattan Beach Municipal Code Section 3.08.060.A.6.c, the emergency demolition and replacement phase is being carried out through multiple emergency contracts. To date the City has expensed, encumbered, or planned for the following amounts:


General
Fund
Prop A
Fund
Meas M
Fund
Parking
Fund
TOTAL
DEMOLITION





Actual
-
-
-
37,143
37,143
Planned
-
-
-
512,857
512,857
Subtotal
-
-
-
550,000
550,000
INTERIM LOT





Planned
-
-
-
66,238
66,238
Subtotal
-
-
-
66,238
66,238




General
Fund
Prop A
Fund
Meas M
Fund
Parking
Fund
TOTAL
SHUTTLE





Actual
-
63,408
6,000
335
69,743
Planned
-
25,000
-
-
25,000
Subtotal
-
88,408
6,000
335
94,743
LOT CLOSURE





Actual
5,215
-
-
960
6,175
Subtotal
5,215
-
-
960
6,175






GRAND TOTAL
5,215
88,408
6,000
617,533
717,156

BACKGROUND:
The Lot 3 Parking Structure was a City-owned facility at the southwest corner of Morningside Drive and 12th Street in Downtown Manhattan Beach. The three-story structure was constructed in 1971 and contained 146 parking spaces critical to visitors and businesses in the Downtown area. In June 2024, City staff elected to close the structure indefinitely, following a series of onsite ...